Repair and Improve the existing access road that had settled overtime. Major items of work included: Pulverize Existing Asphalt Pavement, 10,350 SY; Roadway Excavation Incl Haul, 1,700 CY; Crushed Surfacing Base Course, 3,600 Tons; HMA Cl 1/2 In PG 58-22, 2,750 Tons; Electrical and Illumination System
Repair and Improve the existing access road that had settled overtime. Major items of work included: Pulverize Existing Asphalt Pavement, 10,350 SY; Roadway Excavation Incl Haul, 1,700 CY; Crushed Surfacing Base Course, 3,600 Tons; HMA Cl 1/2 In PG 58-22, 2,750 Tons; Electrical and Illumination System