This Contract provides for the improvement and/or the construction of bike lanes, ADA-compliant curb ramps, pedestrian refuge islands, pedestrian crossings and midblock crossings, bicycle signal detection and APS, HAWK beacon system, electrical duct bank, 5500’ of 12” water main, sewer main replacement, stormwater upgrades, and grind and overlay.
This Contract provides for the improvement and/or the construction of bike lanes, ADA-compliant curb ramps, pedestrian refuge islands, pedestrian crossings and midblock crossings, bicycle signal detection and APS, HAWK beacon system, electrical duct bank, 5500’ of 12” water main, sewer main replacement, stormwater upgrades, and grind and overlay.