Fish Passage & Stream Restoration

Rainbow Bend

Maple Valley, WA

This project consists of the creation of wetland along the Cedar River. The Work required to complete this project includes installing and maintaining temporary erosion and sediment control facilities; providing temporary traffic control; removing noxious weeds; clearing and grubbing; removing garbage and miscellaneous abandoned infrastructure from the Site; tree salvage; installing and maintaining temporary de-watering and isolation facilities; excavation of about 60,000 TCY and haul; wetland grading; wetland soil amendment; placing and anchoring large woody debris and wildlife habitat snags; and seeding and planting. The project duration allowed for 2 seasons, but ACI was able to substantially complete the project within 1 season.

This project consists of the creation of wetland along the Cedar River. The Work required to complete this project includes installing and maintaining temporary erosion and sediment control facilities; providing temporary traffic control; removing noxious weeds; clearing and grubbing; removing garbage and miscellaneous abandoned infrastructure from the Site; tree salvage; installing and maintaining temporary de-watering and isolation facilities; excavation of about 60,000 TCY and haul; wetland grading; wetland soil amendment; placing and anchoring large woody debris and wildlife habitat snags; and seeding and planting. The project duration allowed for 2 seasons, but ACI was able to substantially complete the project within 1 season.

Integrity━━━Excellence━━━Safety Driven━━━Commitment━━━Resourceful━━━Have Fun━━━Get Active━━━