Fish Passage & Stream Restoration

Orville Road Engineered Logjam Setback Revetment – Phase 2

Orting, WA

Construction of approximately 2,000 feet of setback revetment near the left bank of the Puyallup River between RM 27.8-28.2. The revetment consisted of a series of precast concrete units (aka do lo) combined with a series of logs.

Construction of approximately 2,000 feet of setback revetment near the left bank of the Puyallup River between RM 27.8-28.2. The revetment consisted of a series of precast concrete units (aka do lo) combined with a series of logs.