Parks & Trails

East Lake Sammamish Trail

SE 43rd WAY to SE 33rd Street) E Lake Sammamish Pkwy SE, Sammamish, WA 98074

Improve former railroad bank between the Issaquah/Sammamish city limit and Southeast 33rd Street. Work includes removal of existing gravel trail and construction of approx 1.3 miles of 12′ wide paved trail with gravel shoulders, concrete driveway crossings, and stream mitigation planting. Other items of work include erosion control, site preparation, grading, structural earth wall, fencing, stormwater vault, stormwater conveyance system, signage, traffic control, trail amenity items, and landscaping.

Improve former railroad bank between the Issaquah/Sammamish city limit and Southeast 33rd Street. Work includes removal of existing gravel trail and construction of approx 1.3 miles of 12' wide paved trail with gravel shoulders, concrete driveway crossings, and stream mitigation planting. Other items of work include erosion control, site preparation, grading, structural earth wall, fencing, stormwater vault, stormwater conveyance system, signage, traffic control, trail amenity items, and landscaping.

Integrity━━━Excellence━━━Safety Driven━━━Commitment━━━Resourceful━━━Have Fun━━━Get Active━━━