79 lot residential housing plat complete including logging, clearing, erosion control, site grading, sewer, storm drainage, water, JUT trenching, streets, sidewalk, lighting along with site grading for 87 future phase building lots.
79 lot residential housing plat complete including logging, clearing, erosion control, site grading, sewer, storm drainage, water, JUT trenching, streets, sidewalk, lighting along with site grading for 87 future phase building lots.