Location: Cispus River/Yellowjacket Creek (Near Camp Cispus)
Start/finish Date: June 2023 - september 2023
Contract: $697,358.20
Description: This project consisted of the installation of 16 Apex Engineered Logs Jams and 11 Side Channel Roughness Engineered Log Jams along the channel of Yellowjacket Creek near the confluence of the Yellowjacket and Cispus River. This included installing timber piles to stabilize each of the ELJ’s, along with channel grading.