Location: kent, wa
Start/finish Date: june 2022 -
Contract: $466,466
Description: The project consists of raising the existing road slump by digging out the failing pavement and rebuilding the roadway section. The driveway, sidewalk, curb and gutter will also be removed and raised to finished grade. 120’ of storm sewer pipe and a catch basin will be removed and replaced. 110’ of 8” diamter waterline will be removed and replaced with 8” restrained joint pipe. two dcda faults will be replaced with above ground baults. 100’ of 16” concrete cylinder pipe watermain will be exposed and it’s condition will be evaluated to determine if repairs are needed.