Location: lacey, wa
Start/finish Date: september 2024
Contract: $634,634.00
Description: Street reconstruction of Homann Dr. including road removal and new installation of new storm drainage improvements, sidewalks, ADA curb ramps, driveways, curb & gutter, adjusting utility appurtenances, and striping. Work also includes asphalt overlay at the Pacific Ave/Homann Roundabout and installation of new striping and two sharrow routes inside city limits.
![20240923_211315.jpg](https://images.squarespace-cdn.com/content/v1/555f47a7e4b033c75b99dfa0/1737068229449-E0WU3RQC02HRBE4JNREG/20240923_211315.jpg)
![IMG_20240916_090355.jpg](https://images.squarespace-cdn.com/content/v1/555f47a7e4b033c75b99dfa0/1737068230243-1WB66QE3JXLPBBCO9OBJ/IMG_20240916_090355.jpg)
![IMG_20240916_090402.jpg](https://images.squarespace-cdn.com/content/v1/555f47a7e4b033c75b99dfa0/1737068232487-NDR3262DIM55P90IN5HS/IMG_20240916_090402.jpg)
![IMG_20240919_220201.jpg](https://images.squarespace-cdn.com/content/v1/555f47a7e4b033c75b99dfa0/1737068232096-90GBBMRZ7C3R88I2YZSJ/IMG_20240919_220201.jpg)
![IMG_20240923_203317.jpg](https://images.squarespace-cdn.com/content/v1/555f47a7e4b033c75b99dfa0/1737068234120-YRNWUCCDFQP19IVB6F4A/IMG_20240923_203317.jpg)
![IMG_20240926_100154.jpg](https://images.squarespace-cdn.com/content/v1/555f47a7e4b033c75b99dfa0/1737068235186-WFA4H0CC26JKS0T9AW16/IMG_20240926_100154.jpg)