LOCATION: Olympia, WA
START DATE: 2014
CONTRACT: $1,431,682
DESCRIPTION:
The scope of the project provided bridge replacement of Littlerock Road SW at Salmon Creek crossing. Construction includes removing existing three span bridge and constructing a 71ft span bridge, roadway work approaching the proposed bridge, cantilevered sheet pile walls & guardrail installation. Other major work included, pulverizing existing asphalt (3,000 SY); crushed surface base course (1,500 ton); wetland mitigation; and other work.