Location: chehalis, wa
Start/finish Date: july 2024 - january 2025
Contract: $1,897,897.00
Description: Improvement of Logan Hill Road by removing a fish barrier and constructing a stream bypass, structure excavation, constructing a new precast culvert, anchored large woody debris, re-aligning Berwick Creek, planting mitigation, crushed surfacing, guardrail, and asphalt.

 

Location: university place, wa
Start/finish Date:march 2024 - july 2024
Contract: $4,084,084.00
Description: The work to be performed under this contract includes furnishing the necessary labor, materials, equipment, tools and guarantees thereof to: construct curbs, gutters, planter strips, sidewalks, concrete walls, bike lanes, storm drainage improvements, paving, landscaping, irrigation, traffic signal modifications, and streetlights from Bridgeport Way to Cirque Drive.

 

Location: longview, wa
Start/finish Date: june 2024 - december 2024
Contract: $1,913,913.00
Description: This project included the removal of an aging 10’ diameter steel culvert over Erick Creek on Abernathy Creek Road and replacing it with a Multi Plate Steel Arch Culvert with cast in place stemwalls, wingwalls and headwalls. Other critical elements of the project included installation of a stream bypass , restoration of the original streambed and removal of invasive vegetative species. The project also included the use of an automated 1-way directional traffic signal to route traffic around the construction site. This improvement will allow fish passage from the Columbia River, up Abernathy Creek and then into Erick Creek.

 

Location: ruston, wa
Start/finish Date: september 2024 - march 2025
Contract: $1,025,025.00
Description: Work includes installation of new storm drainage, and removal and replacement of roadway intersection corners and sidewalk to comply with current ADA regulations including new curb, sidewalk, asphalt pavement and illumination.

 

Location: gig harbor, wa
Start/finish Date: July 2024-August 2025
Contract: $4,603,603.00
Description: This pedestrian improvement project on the east side of Burnham Drive in Gig Harbor WA. The project included clearing and grubbing as well as utility relocation to accomplish widening of the road section with bike lane and cement concrete curb, gutter, sidewalk and driveways. The project includes cast in place concrete retaining walls, installation of improved storm pipes and structures and an illumination system. The half lane will also receive an upgrade of grind and overlay with new striping permanent signing and erosion and sediment control measures. A portion of the project will also include wetland mitigation and landscaping. Last but not least, the project includes installation of a bridge to replace the current culvert drainage near 95th St. The bridge will be completed with decorative art form lined onto the surface of the traffic barriers. The creek beneath the bridge will be restored to natural streambed bottom by removing the old culvert pipe and will result in a natural bottom which will allow free flow drainage and provide habitat for aquatic species. The project will be completed over two Seasons and Season 1 will terminate once the road improvements are completed to the bridge from the south and the abutments, geosynthetic wall and fascia walls are complete. Season 2 will be reserved for excavation of the stream channel, completion of the bridge and roadway improvements north of the bridge as well as the grind and overlay for the entire project.

 

Location: lacey, wa
Start/finish Date: september 2024
Contract: $634,634.00
Description: Street reconstruction of Homann Dr. including road removal and new installation of new storm drainage improvements, sidewalks, ADA curb ramps, driveways, curb & gutter, adjusting utility appurtenances, and striping. Work also includes asphalt overlay at the Pacific Ave/Homann Roundabout and installation of new striping and two sharrow routes inside city limits.

 

Location: olympia, wa
Start/finish Date: october 2024 - november 2024
Contract: $135,135.00
Description: Install quarry spalls at the base of an eroded slope and extend existing storm drainage to prevent any future erosion on a steep slope. Place native soil and gravel borrow to cover quarry spalls, and place erosion control BMPs protect new and existing soil.