Location: Renton, Wa
Start/finish Date: april 2017 - august 2017
Contract: $1,521,000
Description: This project replaced a 100-foot section of 48-inch diameter corrugated metal pipe culvert with an 8-foot-wide reinforced concrete box culvert and placing natural streambed features within the box culvert.

 

Location: CLOQUALLUM ROAD, SHELTON WA
Start/finish Date: JULY 2017 - november 2018
Contract: $2,123,123
Description: Improvement of the County Road Cloquallum Road MP 5.85 - MP 6.60 located in Mason County, by clearing and grubbing, removal of bituminous pavement, ditch excavation, roadway excavation, embankment compaction, schedule A culvert pipe, select borrow, quarry spalls, CSBC, CSTC, HMA, seeding, fertilizing, mulching, plastic covering, paint line, and beam guardrail type 31. 

 

Location: port orchard, WA
Start Date: JULY 2017
Contract: $15,000,000
Description: Construct the Tremont Street from State Route 16 to port orchard boulevard. the project consists of constructing new widened roadways, medians, bike lanes, planting strips, sidewalks, and roundabouts along tremont street at the intersections with south kitsap boulevard and pottery avenue. this work includes storm drainage piping, structures, and vaults; new water mains, service lines, and appurtenances; sanitary sewer mains, laterals, and service connections; illumination system;a common utility trench consisting of new conduits, vaults, and junction boxes for power, communication services, and spare conduits; a conduit system for a future traffic signal at south kitsap boulevard, a new traffic signal system for potter avenue, and a signalized pedestrian crossing along tremont street; retaining walls; landscaping, irrigation, and a decorative entrance sign for the south kitsap boulevard roundabout, and the RELOCATION of existing signs and advertising structures.

ACI’s Tremont Street Widening Project received the American Public Works Association under $25 Million Project of the Year Award. Very cool and complex project that would not have been completed on time without the ACI TEAM.

Project consisted of constructing new widened roadways, medians, bike lanes, planting strips, sidewalks, and roundabouts along Tremont Street at the intersections with South Kitsap Boulevard and Pottery Avenue. This work included storm drainage piping, structures, and vaults; new water mains, service lines, and appurtenances; sanitary sewer mains, laterals, and service connections; illumination system; a common utility trench consisting of new conduits, vaults, and junction boxes for power, communication services, and spare conduits; a conduit system for a future traffic signal at South Kitsap Boulevard, a new traffic signal system for Pottery Avenue, and a signalized pedestrian crossing along Tremont Street; retaining walls; landscaping, irrigation, and a decorative entrance sign for the South Kitsap Boulevard roundabout; and the relocation of existing signs and advertising structures.

 

Location: olympia, WA
Start/finish Date: april 2018 - october 2018
Contract: $3,294,201
Description: Construct a roundabout at the intersection of boulevard road se and morse-merryman road se. work included clearing and grubbing, pavement removal, road widening and grading, compaction, cement concrete curb and sidewalk, storm-water conveyance and storm-water treatment facility, replacement of asbestos cement water main, joint utility trench excavation and conduit INSTALLATION, private utility conversions, illumination system, not mix asphalt roadway, channelization, and landscaping.

AWARDED “2020 Public Works Project of the Year Award ApplicationAPWA Washington State Chapter | Transportation Project Over $5 Million”

 

Location: orting, Wa
Start/finish Date: november 2017 - march 2018
Contract: $1,350,417
Description: Construction of approximately 2,000 feet of setback revetment near the left bank of the Puyallup River between RM 27.8-28.2. The revetment consisted of a series of precast concrete units (aka do lo) combined with a series of logs.

RELATED LINKS:
https://piercecountywa.gov/3159/Puyallup-River-Flood-Protection-at-Orvil

 

Location: Tacoma, wa
Start Date: January 2018
Contract: $2,369,926
Description: Mass excavation, Site Grading, and utilities for 2 commercial buildings in downtown Tacoma.

 

Location: edgewood, wa
Start Date: november 2017
Contract: $4,233,718
Description: this project is a development of a 16.13 acre parcel for construction of 288 new multifamily residential units. aci will perform tesc, clearing & grubbing, earthwork, grading, footing excavation & back-fill, storm & roof drains, water & sewer utilities and demo & grading at row.

 

Location: fife, wa
Start Date: february 2018
Contract: $3,026,000
Description: Road improvements on 66th Avenue from approximately 20th Street to 26th Street; offsite stormwater and parking improvements including grading, surfacing, paving, stormwater, water, illumination, curb, gutter, sidewalk, striping, signing, and traffic control. All work shall be in accordance with the Contract Documents, City of Fife Standards, and WSDOT 2016 Standard Specifications.